Announcements

Month: May 2018

BPC Retreat in Haa

Tashi Gyelmo General

The Management and Sr. Managers gathered in Haa for the annual retreat on 26th May, 2018. The one day retreat was chaired by Hon’ble Managing Director, BPC. The meeting discussed on some of the critical topics such as ISO, Internal Audit Charter, DMS, VEEET, outsourcing of Deposit Works and CSP related discussion on Vision, Mission and destination statement of BPC.

The meeting saw active participation from all the participants. Sifting through the importance of the topic, the participants shared their views and rendered support to the changes and initiatives under-taken by individual departments/divisions. The participants also offered Mermey Tongchoe at Lhakang Karpo.

The meeting adjourned with thanks and appreciation from Hon’ble Managing Director.

Notice Inviting Tender-CMTD Begana

Information Technology Tender Tags:

NIT for R&M works

[pdf-embedder url=”http://www.bpc.bt/wp-content/uploads/2018/05/Civil-works-2.pdf” title=”Civil works”]

[pdf-embedder url=”http://www.bpc.bt/wp-content/uploads/2018/05/Frabication-Works.pdf” title=”Frabication Works”]

Bhutan Power Corporation Limited (BPC) CORPORATE MEMBER of International Association of Impact Assessment (IAIA)

Tashi Gyelmo General

BPC became corporate member of IAIA in 2016 and have renewed the membership for another one year starting May 2018.

As a corporate member, BPC’s benefits includes:

  • Establish our organization as a leader in social and environmental responsibility.
  • Connect with potential customers through IAIA’s network, and its 700+ participants at IAIA’s annual conferences.
  • Stay current in the latest international news and developments in Impact Assessment (IA), and receive the IAIA journal – the widely acclaimed international journal of IAIA.
  • Learn how IA as practiced around the globe can benefit you in the work you do and how you can contribute to improved global IA practices.
  • Access outstanding training available on IA techniques at both the IAIA annual conferences and through customized in-house opportunities.
  • Raise the profile of our company’s IA activities.
  • Show our company’s leadership in applying IA.

 

Impact assessment, simply defined, is the process of identifying the future consequences of a current or proposed action. IAIA is the International Association for Impact Assessment, the leading global network on best practice in the use of impact assessment for informed decision making regarding policies, programs, plans and projects. IAIA was organized in 1980 to bring together researchers, practitioners, and users of various types of impact assessment from all parts of the world. IAIA involves people from many disciplines and professions. IAIA members include corporate planners and managers, public interest advocates, government planners and administrators, private consultants and policy analysts, university and college teachers and their students.

IAIA activities seek to;

  1. Develop approaches and practices for comprehensive and integrated impact assessment,
  2. Improve assessment procedures and methods for practical application,
  3. Promote training of impact assessment and public understanding of the field,
  4. Provide professional quality assurance by peer review and other means, and
  5. Share information networks, timely publications, and professional meetings.

IAIA members number more than 1,700 and represent over 120 countries.

http://www.iaia.org

 

Notice Inviting Tender- ESD Phuentsholing

Information Technology Tender

BHUTAN POWER CORPORATION LIMITED

REGIONAL CORPORATE OFFICE

Phuentsholing: Bhutan

Tender No. : BPC/RCO-PLING/ESD-O&M/2018/01 Dated 19/05/2018.

Work Name : Labour Contract for Right of Way (RoW) Clearing of distribution system under ESD, Phuentsholing.

The Bhutan Power Corporation Limited (BPC)  invites sealed bids from Small class categories of Bhutanese National Contractors with W4 (Power and Telecommunications) mentioned in the bidding documents having valid Trade License and registered with the Construction Development Board (CDB) for the works as mentioned below:
Bid Details

a)       Sale of Bid Document

b)       Cost of Bid document

c)       Bid Security

d)       Place of Sale

e)       Date of Submission

f)        Place of Submission

g)       Opening Date

h)       Place of Opening

 

19th May 2018 to 6th June 2018

Nu. 10,000/- each (Non-refundable)

 

ESD, BPC, Phuentsholing.

7th  June 2018 (1500 hours)

ESD, BPC, Phuentsholing

7th  June 2018 (1530 hours)

BPC Conference Hall, Phuentsholing

A complete set of bidding document may be purchased from the office of the Divisional Manager, ESD, Phuentsholing upon submission of copies of valid trade license, CDB registration certificate and Tax clearance certificates with written application. For any queries, contact at+975-5-254429/252100.

Regional Director

Link for advertisement sent to the Kuensel Corporation Limited .

Notice Inviting Tender

Ugyen Tshomo Tender
                                  BHUTAN POWER CORPORATION                                                                            REGIONAL CORPORATE OFFICE (WEST)                                                                     WANGDUEPHODRANG: BHUTAN
Tender No:        BPC/RCO-Civil/Tech-04//2018/02 dated 3rd May, 2018
Work Name: 1.       Construction of Open store shed at Lobeysa, Punakha

2.       Water supply at Olakha Substation, Thimphu

The Bhutan Power Corporation Limited, RCO Wangdue invites sealed bids from small categories Contractors having valid Trade License and registered with the Construction Development Board (CDB) for the works as mentioned above:
Bid Details
a. Sale of Bid Document 3rd May, 2018 to 31st May 2018
b. Bid Security Package 1: 34,250.00
Package 2: 36,000.00
c. Place of Sale RCO (West), BPC, Wangduephodrang
d. Date of submission 1st June 2018 (12:30 hours)
e. Place of submission RCO (West), BPC, Wangduephodrang
f. Opening Date 1st June 2018 (15:30 hours)
g. Place of Opening RCO (West), BPC, Wangduephodrang
A Complete set of bidding document may be purchased by any interested eligible bidder on submission of a written application with copy of valid license to the above address and upon payment of a non-refundable fee of Nu. 10,000.00 (Ngultrum Ten thousand only) payable to Accountant, Finance and Accounts Services, RCO (West), BPC, Wangdue. For any queries, contact at +975-2481734/+0097517876454

 

Regional Director

Wangdue (West)

Notice Inviting Tender

Ugyen Dorji Tender Tags:

The office of Central Maintenance Division, Renewable Energy Department (RED), Thimphu would like to hereby invite sealed Bids from eligible National and International Firms for the following works:

Name of Work: Control & Protection System Upgradation and Synchronization of Chendebji Micro Hydro Power Plant to the Grid at Trongsa.

Estimated Cost: Nu. 2,000,000

Completion Period: 4 Months

Bid Security: Nu. 40,000 (Ngultrum Forty Thousand) or USD 588 (USD Five Hundred and Eighty Eight only)

Tender Document cost: Nu. 10,000 (non-refundable)
Read more »

Vacancy Announcement for ESP(s), RCO Mongar

Information Technology Career Tags:

The Regional Corporate Office, BPC, Mongar would like to invite interested Bhutanese citizen aged between 18 to 50 years to apply for the following vacancy:

 

Sl.No Position title Slot Qualification Type of employment            Place of Posting
 

 

1

 

Elementary Service Personnel(ESP)

 

 

3

 

Below class VIII

 

Contract with possible extension

1.      Gangzur Mini Hydel,ESD Lhuentse (Sweeper/Helper)

2.      Rongchu Mini Hydel, ESD Lhuentse (Sweeper/Helper)

3.      TMD Gyelpozhing (Night Guard/Sweeper)

 

The interested candidate needs to submit the following documents in duplicate along with BPC Job Application Form (Form can be downloaded from BPC website ( www.bpc.bt)

 

  1. Citizenship ID Card.
  2. Online Security Clearance (Validity of 1 Year).
  3. Medical Certificate (Validity of 6 Months).
  4. NOC from current employer, if employed.

The application needs  to be submitted to the Asst. Human Resource Officer, RCO, BPC, Mongar (or)  Divisional Manager ESD Lhuenste (or) Divisional Manager, TMD Gyelpozhing) during Office hours ( 9 AM to 5 PM) latest by May 28, 2018 (FN)

For any queries, please contact Phuntsho Wangdi, AHRO at 4641459/17508237.

 

Regional Director

Re-Invitation for Bids (RCO-Phuentsholing)

Information Technology Tender Tags:

BHUTAN POWER CORPORATION LIMITED

(Registered office, Thimphu)

Regional Corporate Office, Phuentsholing

09/BPC/RCO-PLG/Civil/2018/381                                                           04/05/2018

Re-Tender Notice

Sealed bids are invited from eligible Bhutanese class “Small (W3 Category)” Construction Firms/Contractors for the work as below:

 

Name of Work: Renovation Diesel Generator House in Lhamoizingkha & Re-painting of RCO Building in Phuentsholing.

Estimated Cost:       Nu.822,981.83

Completion Period: 3 Months

Bid Security:           Nu. 16,500

Tender Document cost: Nu. 10,000(non-refundable)

 

The tender document shall be issued upon submission of an application along with copies of valid Trade license & CDB certificate during office hours from 07/05/2018 to 23/05/2018. The last date of submission is 24/05/2018 on or before 14:30Hrs and shall be opened on same day at 15:30Hrs. For further details contact 05-253150/ 17609909/77436975 & 17971839

Regional Director

 

 

Re-commissioning of Chumey Mini Hydel Plant, Bumthang

Tashi Gyelmo General

Coinciding with the celebration of the Golden Jubilee Anniversary of formal diplomatic relation between Bhutan and India, the Chumey Mini Hydel Plant in Bumthang was re-commissioned on May 2, 2018. The plant was inaugurated by HRH Gyaltshab Jigme Dorji Wangchuck.

The Chumey Mini Hydropower Plant was first commissioned on 14th December 1989 by His Excellency Shri Vinod C. Khanna, Ambassador of India to Bhutan (1989-1991).  The hydropower plant catered to the electricity requirement of Bumthang and Trongsa Dzongkhag before the Grid Connection reached the region.

The plant had installed capacity of 1500 kW (3 machines with machine capacity of 500 kW each). The plant was constructed by Central Water Commission (CWC), India, funded by GoI.

  

The plant was running effectively till 2013. The machines started to breakdown frequently from 2013 onwards due to aging. The plan to rehabilitate and upgrade the power plant was then initiated.

On 23rd December 2016, the work to rehabilitate and upgrade Chumey mini hydropower plant was contracted through bidding to Erhard Automation, Austria at USD 2.431 million. The project was funded by BPC and the project period was 24 months. The project was completed in February 2018 as scheduled.  The capacity of the power plant has been upgraded from 1500 kW to 1737 kW.

Besides being a renewable energy source, the rehabilitated hydropower plant will improve the energy reliability of the communities around the powerhouse. The energy system in the area will be more resilient to future unforeseen circumstances, such as major interruption in the supply of power from large hydropower plant.