The Urban, Electrification Division (UED), Distribution & Customer Services Department (DCSD), Bhutan Power Corporation Limited (BPC), Thimphu invites sealed bids from registered eligible large Bhutanese & International firms and joint ventures from these firms for the “Conversion of 33 kV AIS Panel to GIS at Changangkha Substation, Thimphu”. The brief details of the bid are as follows:

1 Bid No. & date BPC/DCSD/UED/C-31 dated June 16, 2018
2 Bid Description Conversion of 33 kV AIS Panel to GIS at Changangkha Substation, Thimphu
3

a)

b)

c)

 

d)

e)

f)

h)

Bid Details:

Cost of bid document:

Bid Sale Date:

Place of sale (address):

 

Submission of bids:

Opening of bids:

Venue for opening of bids:

Estimated Cost:

 

Nu. 10,000.00 (Non- refundable).

16th June 2018 to 6th July 2018

UED, DCSD, BPC, Thimphu.

(Telephone no. 02-321846; Fax No. 02-321847).

26th July 2018 (on or before 14:30 hrs).

26th July 2018 (15:00 hrs).

BPC conference hall, Thimphu.

21.790 million

Read more »

Invitation For Bids For Construction of semi-permanent store shed at Pelrithang, Gelephu.

Ugyen Dorji Tender Tags:

BPC/ICD/FND/Tend-06/2018/

Bhutan Power Corporation Limited would like to invite Sealed bids from eligible Small Class (W3) Bhutanese Contractors registered with Construction Development Board (CDB) having valid trade license and CDB certificate for the following work:

Sl.No Descriptions Details
1 Bids for Construction of semi-permanent store shed at Pelrithang, Gelephu.

(Estimated Cost : 1,304,577.08 )

2 Bid Security Nu. 26091.54
3 Cost of bid document Nu. 10,000/-  (Non-refundable)
4 Date of sale 13.06.2018 – 13.07.2018
5 Date of submission 17.07.2018 (Before 1200 hrs)
6 Date of opening 17.07.2018 (1430 hrs)
7 Venue for opening BPC Conference Hall, Thimphu

Read more »

Vacancy Announcement For CEO

Tashi Gyelmo Career Tags:

Date: 9th June 2018

 The Nomination & Governance Committee (NGC) is pleased to announce the vacancy for the post of Chief Executive Officer, Bhutan Power Corporation Ltd. as given below:

Job Position Qualification & Experience Requirements Service Term
Chief Executive Officer ·      Minimum Bachelor’s degree (full time) with a min. 15 years of experience (18 months of study period will be considered as active service).

·      Must have a min. active service of 3 years at senior managerial level (P1 A and above in the civil service and GM level and above or equivalent position in the corporate/private sector)

On contract for three years initially with possibility of extension.

Read more »

Solar water heating system and Solar Photo Voltaic installed in Begana Training Center

Tashi Gyelmo General Tags:

A small event was organized to commission the newly installed solar water heating system and solar photo voltaic (PV) at Begana training center on 5th June, 2018. The water heating system that runs in both grid and solar can heat up to 1000 liters of water and the Solar PV can generate up to 11 kW of electricity. The water heating system is run on grid from morning 4 AM till evening 6:00 AM and then is run on solar. The 11 kW generated from the Solar PV is used for supplying load to the building  and the excess electricity is supplied to the grid.

The event was graced by the presence of the Managing Director, Management and Sr. officials of BPC. The Management also opened the Eco Park in Begana. The park has an outhouse, view-point, a tree house and a meditation corner to name a few. The space provides a cozy environment for official/family outings.

DCSD Progress Review Meeting, 2018

Tashi Gyelmo General

A Progress Review Meeting (PRM) for Distribution and Customer Services Department (DCSD) was held from 3rd – 4th June 2018. The PRM was conducted to review the progress of various works taken up by the ESDs in financial year 2018 and also to discuss the pressing issues in its core business areas such as – Planning & Budgeting, Operation & Maintenance, and Metering & Billing functions.

 

Two days PRM was graced and chaired by Honorable Managing Director (MD), BPC. In the closing remarks, MD reminded that BPC has been doing very good because of hard work of everybody in BPC and should keep it up in future as well to take the company forward. DCSD being the face of BPC, should always prioritize customer care. He also reminded the core values of BPC and asked everyone to give full cooperation to sort out any issues for improving the overall efficiency of BPC.

SOCIAL FORESTRY DAY TREE PLANTATION PROGRAMS

Tashi Gyelmo General Tags:

To celebrate the Coronation of His Majesty the Fourth Druk Gyalpo and to mark the Social Forestry Day on June 2nd 2018, the Bhutan Power Corporation Limited (BPC) joined the nation in tree plantation program across the country. BPC carried out tree planation program in three locations with support from developing partners and community people. Environment & GIS Division, Corporate Services, BPC, Thimphu coordinated these programs with unwavering support from concerned project offices and their contractors.

 

In Thimphu, 66kV Transmission Project office, Changedaphu in collaboration with the contractors, CDCL and GE T&D India Limited carried out plantation of about 300 saplings of Chirpine (Pinus roxburghii) and Oak (Quercus spp.) at Tsalumarphey, Debsi Phakha, Babesa. The team also conducted a small cleaning campaign in that area right after plantation program.

In Zhemgang, the 400kV Mangdechhu Transmission Line Project Division Office-I, Tingtibi with the contractor M/s. Kalpataru Power Transmission Ltd. in close collaboration with Jigme Singye Wangchuck National Park, carried out the plantation program at Berti Community Forest, Berti village under Trong Gewog. A total of 150 saplings of champ (Michelia spp.) and 125 saplings of Teak (Tectona grandis) were planted in Berti Community Forest and supplied to 26 households in Berti village with one number of Mango (Mangifera indica), Litchi (Litchi chinensis), Walnut (Juglans regia) and Avocado (Persea spp.) saplings for each household.

Similarly, in continuation to the Social Forestry Day event, the 132 kV Project Office, Kanglung, Trashigang in partnership with the contractor, M/S Shyama Power India Limited carried out tree plantation program on 3rd June 2018 at Thrizor and Barshong under Khaling Gewog. A total of 150 numbers of saplings of Mapple (Acer campbellii), Chenju Shing/Pipli (Exbucklandia populnea) and Zala shing (Schima wallichii)  were planted.