February 2009 |
|
| 1 |
the test on 20 MVA, 66/33kV Transformer No. 2. |
Download |
2 |
the test on 66kV Breaker, CVT, 110V & 48 V Battery and Battery Charger |
Download |
|
March 2009 |
|
| 1 |
400 kV double circuit Tx Line for Punatsangchu – I Project |
Download |
| 2 |
66 kV SF6 circuit breaker and CVT |
Download |
| 3 |
the heat treatment and polishing of Rangjung runners |
Download |
|
April 2009 |
|
| 1 |
37th Operation Coordination Committee (OCC) |
Download |
|
May 2009 |
|
| 1 |
steel structure for Turnkey Package for 2×20 MVA, 66/33kV Substation, Olakha |
Download |
|
July 2009 |
|
| 1 |
The test on 66kV Relay & Control Panels |
Download |
| 2 |
Distribution Transformer |
Download |
| 3 |
XLPE Cables at the Factory Premise |
Download |
| 4 |
ACSR Conductor and PVC Cables |
Download |
| 5 |
XLPE Cable and Jointing Kits |
Download |
| 6 |
Transformers at Supplier/Manufacturer’s Factory |
Download |
|
August 2009 |
|
| 1 |
Inspection of 2 x 5 MVA and 3 x 2.5 MVA, 33/11 kV Power Transformer 33/11 kV substation |
Download |
|
October 2009 |
|
| 1 |
Inspection of 11/33kV switchgear panels for 33/11 kV substation |
Download |