Notification on Revised Miscellaneous Charges


Sonam Choki General

This is to notify all our valued customers and the general public that BEA has approved revision of miscellaneous charges for BPC vide letter no. BEA/CEO/BPC/2021-2022/148 dated 26 August 2021 as under. BPC shall implement the revision with immediate effect.

A) Meter Security
ParticularsExisting Rates (Nu)Revised Rates (Nu)
 Meter Security DepositCost of MeterShall be discontinued

B) Energy Security

Sl. No.Consumer CategoryExisting Rates (Nu)Revised Charges (Nu)
1 LV Single Phase (Rural)10/A5/A
2 LV Single Phase (Others) 10-60 A20/A20/A
3 LV Three Phase60/A60/A
4 LV Three Phase with CT Metering60/A60/A
5 Medium Voltage (MV)120/kVA rating of the transformer120/kVA rating of the transformer
6 High Voltage (HV)120/kVA rating of the transformer120/kVA rating of the transformer

C) Supply Reconnection Charges

Sl. No.Consumer TypeExisting Charges (Nu)Revised Charges (Nu)
1 LV Single Phase100100
2 LV Three Phase150200
3 Medium Voltage500200
4 High Voltage500200

D) New Service Connection Charges

Sl. No.Consumer TypeExisting Charges (Nu)Revised Charges (Nu)
1 LV Single Phase100For the initial supply release to a consumer premises no charges shall be levied for testing, connection and installation. However, consumer availing the services subsequently, shall be charged at the prevailing rate
2 LV Three Phase150
3 Medium Voltage500
4 High Voltage500

E) Capacity Reserve Charges

Sl. No.Consumer TypeExisting Charges (Nu)Revised Charges (Nu)
1 HV and MV customersEqual to demand charge for three months calculated on the conditionally sanctioned loadEqual to demand charge for three months calculated on the conditionally sanctioned load

F) Late Payment Surcharge

Sl. No.ParticularsExisting ChargesRevised Charges
1 All categories of customers2% per month of the billed amount2% per month of the outstanding billed amount non compounding

Awareness on Electrical hazards in Excavation


Sonam Choki General

The Chief Executive Officer (CEO) of Bhutan Power Corporation Limited (BPC) graced the three-day safety awareness program (August 30, 2021 to September 01, 2021) targeted for the excavator operators of Thimphu. Director, Distribution Services and other officials were also present.

The Electricity Services Division (ESD), BPC Thimphu has been facing numerous issues created by excavations being done in and around Thimphu. The excavations usually happen without the knowledge of BPC, and the damages done to the electrical infrastructure often go un-reported translating to wastage of BPC resources in locating the fault and rectification thereof. These excavations and consequent damages to the electrical infrastructure result in prolonged outages to the customers of BPC. Also, there are inherent risks posed to the excavators who operate the machines in the absence of proper supervision of the excavation works.

Therefore, BPC initiated a three-day safety awareness program in an effort to raise adequate awareness to the machine/excavator operators operating in Thimphu. The program shall help the excavators take conscious steps towards risk reduction and to remain vigilant to any potential threats from damage of electrical infrastructure. The operators shall now be required to inform BPC for any excavation works and seek BPC’s support to avoid damages to the electrical infrastructure.

Around 75 excavator operators shall be trained under this program

Emergency Shutdown Notification


Sonam Choki General

132/33/11kV SMD Nangkor will be taking emergency shutdown of all 33kV & 11kV feeders from 5:00PM till 7:30PM, today (23/08/2021) to inspect incomer CT on 11kV side. The power supply to following gewogs shumar, Zobel, Nanong, Khar, Chongshing, Yurung, Dungmin & chimung will be affected.

ESD, Pema Gatshel

SAP Production Server Downtime


Sonam Choki External

BPC is going to take SAP production services downtime on 13th-08-2021 from 7:00 pm onwards for migration of storage server. Inevitably all SAP transactions, Bank integrations and other online SAP services will face outage down to completion of the migration activities. The task force team shall strive to normalize the services at the earliest and apprise all the concerned accordingly.

We regret for the inconveniences and solicit for your kind cooperation please.

1 24 25 26 27 28 59