6th May, 2025
BPC/D&CSD/ESD -ZHEM/W-01/2025/3
The Electricity Services Division, Zhemgang, Distribution & Customer Services Division (D&CSD), Bhutan Power Corporation Limited (BPC), Employer invites e-bids from eligible Bidders with small class (W4 Category, Power and Telecommunication) Bhutanese National Contractors having valid Trade License and registered with the Construction Development Board (CDB) for the work mentioned below:
Tender ID | WS1549309908 |
Name of the Work | Labor Contract of Plan Works of ESD, BPC Zhemgang – Package T1-2025 |
Dept. Estimate | 3.38M |
Bid Security | Nu. 67,583.07 [Ngultrum Sixty Seven Thousand Five Hundred Eighty Three and Chhetrum Zero Seven] only. |
Contract Duration | Five (5) Months |
Class/ Category | Small class (W4 Category, Power and Telecommunication) |
Date of Submission | 23rd May, 2025 on or before 2:00 PM |
Date of bid opening & Venue | 23rd May, 2025 at 2:30 PM at O&M Room, ESD, BPC, Zhemgang. |
Mode of Bid Submission | Online SAP Ariba e-Procurement |
Interested and Eligible bidders can register on BPC SAP Ariba e-Procurement system and submit bid online. (Dully signed Integrity pact, signed bid submission form, bid security, valid CDB certificate, valid license, and valid tax clearance certificate). The original copy of bid security shall be submitted to BPC Office before bid opening.
For clarification, kindly contact @+975-03-741147/17570630 at Office hours.
1st May, 2025
BPC/TOMD/TOMS-TSI/CIV-02/2025/6
The submission deadline for the Tender No. BPC/TD/TOMS/Tsirang/2025/Tender-01 (Construction of a Gabion wall and maintenance of control room building at Dhajay Substation, maintenance of building at Dagapela under TOMS, BPC Tsirang and maintenance works under ESD, Tsirang.) is extended till May 09, 2025. The Bids shall be opened at 1500 hours on the same day.
All other terms and conditions specified in the bidding documents shall remain unchanged.
Senior Manager
TOMS,TOMD,BPC,Tsirang
BPC/D&CSD/ESD-TRO/Tech5/2025/03
The submission deadline for the Tender No. BPC/D&CSD/ESD-TRO/Tech5/2025/03 (Labour Contract of Plan Work– Package Q18-2025, ESD, Trongsa) is extended till 1400 hours, May 09, 2025. The Bids shall be opened at 1430 hours on the same date. The double entry in the BOQ in sections 9.13 & 9.15 as announced via Clarification Notice on Bidding Documents (ESD, TRONGSA) dated 28th April 2025, has been corrected.
All other terms and conditions specified in the bidding documents shall remain unchanged.
1. Tender Reference: BPC/D&CSD/ESD-TRO/Tech5/2025/02 (Dated April 15, 2025)
(BOQ for Plan Work Q17, 2025)
This serves to notify all bidders of the following corrections in the Bill of Quantities (BOQ):
- Section 9.3: Construction of 33/0.415 kV, 125 kVA Substation & LV ABC for Spring Water Plant near Willing Resort
- Sub-section 9.3.1.2: Laying and Stringing of ACSR Rabbit/Dog Conductor (3-Phase, 3-Wire), Testing, Commissioning, and Associated Works
- Correction: The unit of measurement (UoM) for the quantity is incorrectly stated as “Kilometer” and should be “Meter”.
- Existing in Ariba: 300 Kilometer → Correct as: 300 Meter
- Correction: The unit of measurement (UoM) for the quantity is incorrectly stated as “Kilometer” and should be “Meter”.
- Sub-section 9.3.1.2: Laying and Stringing of ACSR Rabbit/Dog Conductor (3-Phase, 3-Wire), Testing, Commissioning, and Associated Works
- Section 9.10: Construction of 33/0.415kV, 125 kVA Substation near Forest Office, Chengdebji
- Sub-section 9.10.1.4: Laying and Stringing of ACSR Rabbit/Dog Conductor (3-Phase, 3-Wire), Testing, Commissioning, and Associated Works
- Correction: The unit of measurement (UoM) for the quantity is incorrectly stated as “Kilometer” and should be “Meter”.
- Existing in Ariba: 100 Kilometer → Correct as: 100 Meter
- Correction: The unit of measurement (UoM) for the quantity is incorrectly stated as “Kilometer” and should be “Meter”.
- Sub-section 9.10.1.4: Laying and Stringing of ACSR Rabbit/Dog Conductor (3-Phase, 3-Wire), Testing, Commissioning, and Associated Works
Tender Reference: BPC/D&CSD/ESD-TRO/Tech5/2025/03 (Dated April 15, 2025)
(BOQ for Plan Work Q18, 2025)
This is to clarify that there is a double entry in the BOQ for the following sections:
- Section 9.13 & 9.15: Extension of 33kV Line with ACSR Rabbit Conductor (3-Phase, 3-Wire) and Shifting/Relocation of 33/0.415kV, 25kVA Distribution Transformer & LVABC Line of Karshong Shedra.
Action: The subsections under Section 9.15 will not be considered biddable. Bidders should refer only to Section 9.13 for pricing.
Contact for Clarifications:
For further assistance, please call 521102 during office hours (9:00 AM to 5:00 PM).
April 28, 2025
BPC/C&PD/CMS/TENDER-2025/16
The submission deadline for the Tender No. BPC/C&PD/CMS/TENDER-2025/16 (Construction of chain-link fencing (6×6)m around distribution substations near Buli School and Zhemgang Primary School & Laying PCC pavement within store yard for stacking of outdoors materials at Tingtibi) is extended till 1400 hours, May 06, 2025. The Bids shall be opened at 1430 hours on the same date.
All other terms and conditions specified in the bidding documents shall remain unchanged.