RE-ANNOUNCEMENT OF NIT FOR CONSTRUCTION OF G+2 STAFF QUARTER BUILDINGS FOR TRANSMISSION DEPARTMENT.


Sonam Choki Tender Tags:

TD/BPC/2022/Vol-1/108                                                                                                                                  

Bhutan Power Corporation Limited would like to invite sealed bids from eligible Large and Medium Class (W3) Bhutanese Contractors registered with Construction Development Board (CDB) having valid trade license and CDB certificate for the following work:

a)Bids forConstruction of 2 Nos. G+2 Staff Quarter at Gomtu.   (Estimated Cost: Nu. 34,587,474.00)Construction of G+2 Staff Quarter at Nanglam.   (Estimated Cost: Nu. 19,169,862.00)Construction of G+2 Staff Quarter at Yurmoo.   (Estimated Cost: Nu. 19,087,588.00)
b)Bid securityNu. 692,000.00Nu. 384,000.00Nu. 382,000.00
c)Cost of bid documentNu. 3,000/- (Non-refundable)Nu. 1,500/- (Non-refundable)Nu. 1,500/- (Non-refundable)
d)Contractor ClassLarge (W3)Medium (W3)Medium (W3)
e)Date of sale25.05.2022 – 09.06.2022
f)Date of submission09.06.2022 (On or before 12:00 hrs)
g)Date of opening09.06.2022 (14:30 hrs onwards)
h)Venue for openingBPC Conference Hall, Thimphu
Interested bidders may purchase the complete set of bidding document from Transmission Department (Third floor), BPC Head Office, Thimphu upon submission of written application along with copies of valid trade license, CDB registration certificate and Tax clearance certificate to the General Manager, Transmission Department, BPC, Thimphu on or before 24.05.2022 during working hours.  
Bidding documents can also be downloaded from www.bpc.bt. The bidder who have downloaded the bid document and wish to participate should register with GM, TD, TS, BPC, Thimphu with registration fee of Nu. 200.00, prior to the closing of bid sale date.  

For any other queries, contact Mr. Dorji Kinley, Executive Engineer at +975 2 322046 / 17117848.  

The scope of work includes following:
1. Site grading works.
2. Demolition of existing temporary sheds and aged bungalows.
3. Construction G+2 RCC framed structure with AAC block infill walls.
4. Internal electrification works and street lighting.
5. Indoor and outdoor Plumbing and sanitary works.
6. RRM walls, parking, and road works.
7. Other work as per the Bid document.