
The Memorandum of Understanding was signed on 10th July, 2020 between Department of Renewable Energy, MoEA and Bhutan Power Corporation to implement the 180kW Pilot Solar Power Project at Rubessa. The project cost is around 200,000 USD and shall be implemented over a period of 9 months. BPC shall do the designing, procurement and installation of the pilot solar project with grid connection at 11kV level. The main outcomes of the project shall be to demonstrate and test the feasibility and viability of the large scale solar technology in Bhutan and to build the institutional capacity.
Vacancy Announcement for Technician II (Electrical & Mechanical)
Bhutan Power Corporation Limited is pleased to invite applications from the interested & eligible Bhutanese citizens, who are 18 years and above, for the following positions:
Sl.No | Post | Grade | Minimum Qualification | Nos |
1 | Technician II (Electrical) | C2 | Class X Pass + Certificate in Electrical Engineering / National Certificate Level 2 (NC2) Electrical | 23 |
2 | Technician II (Mechanical) | C2 | Class X Pass + Certificate in Mechanical Engineering / National Certificate Level 2 (Mechanical (Welder/Fitter)) | 4 |
1. BPC reserves the right to increase the number of intakes or may not take any, depending on the capablity of the candidates and their performance in the interview.
2. Incase, there are more requirements than the announced posts within 6 months, BPC shall recruit from the merit standby list.
Interested candidates should email the scanned copies of the following documents along with BPC Job Application Form.
Download Job application formRead more »
In pursuant to the internal vacancy announcement of Head, Wind Power Unit, Renewable Energy Division, Wangdue Phodrang via letter No.BPC/HRA/HR-01/2020/979 dated June 19, 2020 and the selection interview held on July 6, 2020 HRAD is pleased to declare the outcome of the result. The selected candidate for the aforementioned position is as follows:
Sl. No. | Candidate Name | Office | Result |
1 | Wangchuk (30000946) | WPU, RED, W/Phodrang | Selected |
In pursuant to the internal vacancy announcement of Manager, System Utilization Implementation Team, Information & Communication Department, Thimphu via letter No.BPC/HRA/HR-01/2020/980 dated June 19, 2020 and the selection interview held on July 6, 2020 HRAD is pleased to declare the outcome of the result. The selected candidate for the aforementioned position is as follows:
Sl. No. | Candidate Name | Office | Result |
1 | Jigme Dorji (30001347) | SUIT, ICD, Thimphu | Selected |
Selected candidate for Head, Planning & Monitoring Unit, Metering, Billing & Collection Unit , Operation & Maintenance Unit
In pursuant to the internal vacancy announcement of Head, Planning & Coordination Unit, Metering, Billing & Collection Unit, Operation & Maintenance Unit under Electricity Services Division, Thimphu via letter No.BPC/HRA/HR-01/2020/982, 983, 984 dated June 19, 2020 respectively and the selection interview held on July 6, 2020 HRAD is pleased to declare the outcome of the result. The selected candidate for the aforementioned positions are as follows:
Planning & Monitoring Unit
Sl. No. | Candidate Name | Office | Result |
1 | Sonam Pelden Tshewang (30000579) | ESD, Thimphu | Selected |
Metering, Billing & Collection Unit
Sl. No. | Candidate Name | Office | Result |
1 | Dorji Gyeltshen (30001983) | ESD, Thimphu | Selected |
Operation & Maintenance Unit
Sl. No. | Candidate Name | Office | Office |
1 | Sonam Tobgay (30000386) | ESD, Thimphu | Selected |