Tender No.: BPC/PD/Line Materials/2024/11
The Procurement Division (PD), Bhutan Power Corporation Limited (BPC), Thimphu invites e-bids from interested eligible bidders for the following tender: Supply and Delivery of Distribution and Transmission Line Items and Accessories.
Bidders can visit the BPC website www.bpc.bt for participating in the tender. ‘User login and tender participation manual’ is available in ‘Downloads’ under ‘customer services’ section in BPC website.
For any queries or assistance, please contact +975 2 326289/17882946 during office hours.
Procurement Division
The CMS, BPC, Thimphu invites sealed bids from small Bhutanese Contractor for the following works:
- Tender No. BPC/C&PD/CMS/TENDER-2024/18 (Construction of new and replacement of existing damaged fencing at Distribution substations under ESD, Samdrup Jongkhar)
- Tender No. BPC/C&PD/CMS/TENDER-2024/21 (Construction of retaining wall & PCC pavement
for parking at ESSD Office, Panbang)
Interested eligible bidders can register and participate by submitting the online bidding document using the BPC E-procurement system. For the registration, please contact 17615064/17876454/17403033 during office hours.
Senior Manager
The list of candidates’ shortlisted for (1) post Driver V are as follows:
SN | CID | Home Town | Contact No |
1 | 103****2286 | Dagana | 77***340 |
2 | 107****0270 | Mongar | 17***410 |
3 | 102****7325 | Chhukha | 77***897 |
4 | 115****2741 | Trashigang | 17***503 |
5 | 111****2714 | Samdrup Jongkhar | 17***642 |
6 | 120****2903 | Zhemgang | 17***025 |
7 | 111****4253 | Samdrup Jongkhar | 17***485 |
8 | 115****2919 | Trashigang | 77***517 |
9 | 118****0848 | Tsirang | 17***904 |
10 | 106****1004 | Lhuentse | 17***426 |
The shortlisted candidates should report to Bhutan Power Corporation Limited (BPC), Head Office at 8:45 AM sharp for practical test & Viva Voce on May 21, 2024. The candidates are required to bring along all the original documents for further verification.
Bid No.: TOMS/TINGTIBI/CIVIL WORK/TENDER/2024/02
TOMS, TOMD, TD, BPC, Tingtibi, Zhemgang would like to invite Sealed bids from eligible small category (W1/W4) Bhutanese Contractors registered with Construction Development Board (CDB) having valid trade license and CDB certificate for the following work:
a | Bids for | Construction of PCC Road, Parking and RRM wall at Tingtibi Substation and Construction of Tower Protection wall at Loc. TN-126 at Panbang. (Dept. Estimated: Nu. 2.77 million) |
b | Bid Security | Nu. 55,000.00 (Nu. Fifty-Five Thousand and Che. Zero ) only |
c | Cost of bid document | Non-refundable of Nu.1000.00 for the purchase of hard copy & Nu.300.00 as register fee for those who downloaded from website. |
d | Date of sale | 14.05.2024 to 28.05.2024 |
e | Date of submission | Up to 28.05.2024(before 1200hrs) |
f | Date of opening | On 28.05.2024 at 14:30 hrs |
g | Place of Sale | TOMS, BPC, Tingtibi, Zhemgang |
h | Venue for opening | Conference Hall, TOMS, BPC Tingtibi, Zhemgang |
Interested firm may purchase complete set of bidding documents on submission of written application
along with copies of valid trade license and CDB registration certification to the Sr. Manager, TOMS, TOMD, TD, BPC, Tingtibi, Zhemgang on or before 28.05.2024 (before 1200hrs) during working hours.
The bidding document can also be downloaded from the link below or www.cdb.bt. To register for participation & for any queries, contact with Mr. Norbuling, via contact No. 17560328 and E-mail: norbuling@bpc.bt.
Senior Manager
INAUGURATION CEREMONY OF THE NEWLY CONSTRUCTED STATE OF THE ART CENTRAL WAREHOUSE AT SINGYE, PASAKHA
The Honorable Chief Executive Officer, Bhutan Power Corporation Limited inaugurated the newly constructed State of the Art Central Warehouse at Singye, Pasakha on May 10, 2024. The momentous occasion was attended by Director (DD), Director (CPD), GM (PD) and heads of BPC Divisions and external relevant agencies in Phuentsholing. The warehouse is constructed for Central Stores, Procurement Division, Phuentsholing for storing utility materials which will then be distributed to all micro-stores and other users in the country. The multi-level store (three level) is constructed using pre-engineered building (PEB) with all the modern warehouse features such as industrial lifts, racks and EOT crane and is designed for operating forklifts and reach trucks for efficient operation and management of materials. The warehouse marks a new milestone in BPC that will help Central Stores to efficiently manage receipt, storage and dispatch of materials as per latest industry practices and thereby will contribute to enhanced inventory management system in BPC.