TENDER No. BPC/TS/TD/TMPO/Tsirang/2021/Tender-01
Bhutan Power Corporation Limited (BPC) invites sealed bids from eligible Small Class (W3) Bhutanese Contractors with valid trade license & CDB certificate for the following works
1. | Bid | Construction of Gabion wall and associated works at tower location no KJ 070 at Semjong and KJ 083 at Hathi Dunga under Tsirang Dzongkhag and KJ 137 at Rate Khola under Dekiling Gewog, Sarpang Dzongkhag |
2 | Bid Security | Nu.54,570.00 |
3 | Cost of bid document | Nu. 1000.00 (Non-refundable) |
4 | Contract Period | Six (6) months. |
5 | Date of sale | 14.04.2021 |
6 | Last date of submission | By 28.04.2021 (Before 14:00 hrs. sharp) |
7 | Date & time of opening | 28.04.2021 (15:00 hrs.) |
8 | Venue for opening | Office of Chief Manager at 1st floor of Transmission Maintenance Project Office, BPC Building below RDP Workshop. |
9 | Address for Sale, Submission and Communication | Chief Manager, Transmission Maintenance Project Office, Bhutan Power Corporation Ltd, Tsirang, Bhutan. Telephone: +975-06-471232, email: pemba@bpc.bt |
Interested Contractors may purchase complete set of bidding documents upon submission of written application to Chief Manager, Transmission Maintenance Project Office, BPC, Tsirang, during working hours with copy of valid Trade license, valid CDB certificate and tax clearance certificate. The bid security must be submitted in the forms of Demand Draft/Cash Warrant/Bank Guarantee drawn in favor of Finance Officer, FAS, BPC, Tsirang valid till 28th August, 2021.
Chief Manager
To ensure accurate and timely reading of the household energy meters, Bhutan Power Corporation inaugurated meter reading monitoring system on 12th April 2021 at Taba in Thimphu.
Geo-tagged Quick Response (QR) codes will be placed at every meter location. The meter reader shall scan the QR code using google lens while reading the meter(s) in that location. The location and time details will be stamped and saved in google cloud for every scan performed by the reader. Supervisors and managers can view the data to ensure that meters are read within prescribed time frames and recurrent readings are avoided. Meter reading monitoring system is currently being deployed for Thimphu.
Central Maintenance Division Project Office (CMDPO), Bhutan Power Corporation Limited (BPC), Thimphu, would like to invite sealed bids for the following tender:
Sl. No. | Tender No. & Date | Tender Name | Date for sale | Date for Submission of bids | Date of opening of bids |
1 | BPC/CMDPO/2021 Equipment/2021/01 dt. 08th April 2021. | Supply and delivery of Machineries, Tools, Spares and Consumables. | From 09.04.2021 to 06.05.2021 | 06.05.2021 (13:00 Hrs.) | 06.05.2021 (14.30 Hrs.) |
a) Place of sale (address): | Central Maintenance Division Project Office, Yarden Lam, BPC, Thimphu, Bhutan. Tel # +975-2-330684 Email: herukazangpo@bpc.bt |
b) Venue for opening of bids: | BPC conference hall, Thimphu. |
BPC observed the Zero Waste Hour on April 02 2021 where staffs from Head Office, Electricity Services Division and other BPC offices near the vicinity carried out an hour long cleaning campaign within the office premises and along the Samten Lam, Menchu Lam and Chang Lam areas. By the end of the campaign, the staffs have collected over 80 kg of dry wastes which was later sent to be disposed at Memelakha landfill.
The Zero Waste Hour shall be observed on the 2nd Day of every month to build awareness on the growing challenge of waste management in the country and also to contribute in our own little ways to address the same. Offices in other Dzongkhags, in particular the ESD, Phuentsholing has also observed the Zero Waste Hour.
Read more »