Tender No: 09/BPC/ESD_Sam/O&M_pm/2023/01
Work Name : Labour Contract for Right of Way (RoW) clearing of Distribution lines under Samtse Dzongkhag.
The Electricity Services Division, BPC Samtse invites sealed bids from eligible Small Bhutanese National Contractors with W4 (Power and Telecommunications) having valid Trade License and registered with the Construction Development Board (CDB) for the above work.
Bid Details a)Sale of Bid Document | 30th January, 2023 to 20th February 2023 |
b)Cost of Bid Document | Nu.1000 each(non-refundable) |
c) Place of Sale | ESD, BPC, Samtse and can be downloaded from BPC website |
d) Last date of Submission | 20th February 2023(before 10:00 AM BST) |
e) Place of Submission | ESD, BPC, Samtse |
f) Opening Date | 20th February 2022 (3:00 PM) |
g) Place of Opening | Conference Hall, ESD, BPC,Samtse |
A complete set of bidding document can be purchased by any interested eligible bidder on submission of copies of valid Trade license, CDB registration certificate, Tax clearance certificate and written application addressed to Chief Manager and upon payment of a non-refundable fee of Nu. 1000 (Ngultrum One Thousand) only payable to DFO, Finance and Accounts Services, ESD, BPC, Samtse. For any queries, contact # 05365204/17628144.
The Transmission Operation & Maintenance Section (TOMS), Transmission Operation & Maintenance Division, Transmission Department, Bhutan Power Corporation Ltd., Phuentsholing invites sealed bids from the eligible Bhutanese Small Class (W3) bidders having valid trade license registered with the Construction Development Board (CDB) for the “Construction of Gabion wall for protection works of 400kV D/C critical Tower location no. TPS-48, Pekasay, Sampheling Gewog”. The brief details of the bid are as follows:
1 | Bid No. & date | 39/TOMS/BPC/PLING/Civil/2023/TENDER-01 dated January 27, 2023. |
2 | Bid Description | Construction of Gabion wall for protection works of 400kV D/C critical Tower location no. TPS-48, Pekasay, Sampheling Gewog. |
3 | Bid Details | |
a) | Cost of Bid Document | Nu. 1,000.00 (Non- refundable). |
b) | Bid Sale Date: | 28th January 2023 to 16th February 2023 (Working Hours) |
c) | Place of sale (address): | TOMS, TOMD, BPC, Phuentsholing. (Telephone no. 05-251809). |
d) | Submission of bids: | 17th February 2023(on or before 14:30 hrs.). |
e) | Opening of bids: | 17th February 2023 (on 15:30 hrs.) |
f) | Venue for opening of bids: | BPC Conference hall, Phuentsholing. |
g) | Estimated Cost: | Nu. 1.970 million |
The bidding document can be purchased by any interested eligible bidder upon submission of written application together with valid CDB certificate & trade license to the above address. Bidding documents can also be downloaded from the BPC’s website www.bpc.bt. The bidder who have downloaded the bid document and wish to participate should register with TOMS, TOMD, BPC, Phuentsholing prior to the bid submission date.
Click on the following link to download bid document.
https://myfile.bpc.bt/share.cgi?ssid=210dcca09c3a458fb60cab50f13f146b
Bid No.: BPC/TD/TOMD/TOMS-D/CIVIL/2023/01
TOMS,TOMD,TS, BPC, Deothang, S/Jongkhar would like to invite Sealed bids from eligible Small Class Bhutanese Contractors registered with Construction Development Board (CDB) having valid trade license and CDB certificate for the following work:
a) | Bids for | 1.Construction of Retaining Wall at 132kV Phuntshothang –Motanga Transmission Line at location PM# 39 (Package 1). (Dept. Estimated: Nu. 749,329.31) 2.Construction of Gabion Wall at 132kV Motanga-Nganglam Transmission Line at location MN# 01 and MN#10 (Package 2). (Dept. Estimated: Nu. 888,755.25) |
b) | Bid Security | Package 1:-Nu.14,980.00(Ngultrum Fourteen Thousand Nine Hundred Eighty)only. Package 2:- Nu. 17,770 (Ngultrum Seventeen Thousand Seven Hundred Seventy) only. |
c) | Cost of bid document | Nu. 1000/- (Non-refundable) for the purchase of hard copy & Nu.300 as register fee for those who downloaded from website. |
d) | Date of sale | 27.01.2023-27.02.2023 |
e) | Date of submission | 28.02.2023 (Before 13:00 hrs) |
f) | Date of opening | 28.02.2023 (14:30 hrs) |
g) | Place of Sale | F&AD, BPC, Samdrup Jongkhar. |
h) | Venue for opening | Conference Hall, ESD, BPC, Samdrup Jongkhar. |
Interested firm may purchase complete set of bidding documents on submission of written application along with copies of valid trade license and CDB registration certification to the Manager, TOMS, TOMD, TD, BPC, Deothang, S/Jongkhar on or before 27.02.2023 during working hours.
The bidding document can also be downloaded from www.bpc.bt or www.cdb.bt and register for participation & for any quaries, contact with Mr. Kezang Tashi, via cantact No. 17717258 and E-mail: kezangtashi@bpc.bt.
Click on the following link to download bid document.
https://myfile.bpc.bt/share.cgi?ssid=8b09890ecb0c428296c3986b6ef94520
Bhutan Power Corporation Ltd. declared Go Live for the Integration of SAP ISU System with AMI (Advanced Meter Infrastructure) System today (December 30, 2022).
The project is being implemented by Thimphu TechPark Ltd (TTPL)in collaboration with DrukSmart Private Limited. The SAP – AMI Integration project is envisioned to obtain accurate and automatic meter reading, conduct timely billing, reduce meter reading cost, bring operational efficiency related to billing and energy data management, ensure proper tamper and energy theft detection for corrective measures, take up real time power quality monitoring and reliability analysis, achieve customer service excellence and adopt technology excellence.
The Advanced Meter Infrastructure (AMI) communicates between SAP ISU and Metering System platform connected to smart meters, allowing two-way communication between BPC’s billing system and the customers smart meters.
Under the current phase, 5000 smart meters under ESD – Thimphu will be integrated with SAP ISU system to automate time-consuming and expensive manual tasks such as meter reading and billing disconnecting/reconnecting a meter in the current scope.
Under the next phase, the same will be rolled out to other ESD/ESSDs.
The Medal Award Ceremony was held on December 13 2022. During the ceremony, the CEO read the Royal Command circulated by RCSC and said that the medal is an acknowledgement of each individual’s dedication and hard work for serving the Tsa-Wa-Sum. He further added that with receipts of such prestigious award, one must take pride and responsibilities with dedication in the years ahead. He congratulated all the recipients on behalf of BPC Family. A total of 87 medals were received this year of which 46 were Bronze, 26 Silver, 7 Gold and 8 received Lifetime Achievement Medal.